Case Study 3

Marshall Wace

Marshall Wace are an international company within the financial markets occupying 14,000sq.ft. of space within the Adelphi Building in London. Environmental Air Services Limited were commissioned to undertake a fast track refurbishment of the floor working closely with one of the top interior design fitout contractors in London. The floor was stripped and required extensive modification and additional work to the existing four pipe fan coil and ductwork systems to give the required cooling load to the Dealing area and cellular Board Room and Meeting Room areas.

In addition to these works a new Comms Room was installed during the contract with two close control full function down flow air conditioning units to give both run and standby. Environmental Air Services Limited carried out these works and commissioned the project for completion within the required time frame to enable the Dealing area and Board Room areas to be fully functional and operational from day one of handover.

For further details of similar projects please contact Environmental Air Services Limited on our contact page.